Anchor EVENT SERIES - PROFILE SIZE: 220MM X 100MM, INSTRUCTION SUPPLEMENT - AMBASSADOOR WITH VINYL WALLS INSTALLATION User Manual
Step 1: door preparation assembly
AMBASSADOOR FOR USE WITH VINYL WALLS
INSTALLATION INSTRUCTIONS
ELEVATION
Outside View
Upright (typ.)
Step 1: Door Preparation Assembly
1. Remove door from wood crate utilizing the nylon lifting
straps provided and place face-up (as positioned in
crate) on platform fl oor. (Figure 2)
2. Remove two (2) vertical connector tubes shipped loose
in the wood crate and insert one into the top of each
jamb. The holes in the connector tube must be toward
the top and aligned with the interior/exterior of the frame.
(Figure 3)
3. Loosely bolt one door adapter assembly through the two
holes at the top of each connector tube with the wing
nuts and bolts provided. (Figure 3)
4. Position the Ambassadoor upright directly below the centerline of the eave purlin. Extend each connector tube upward
until the door adapters can be clamped to the eave purlin. Tighten the wing nuts.
5. Level and plumb the ambassadoor. The door is leveled and plumbed correctly when the bottom of each door leaf aligns
and both doors swing without rubbing the threshold.
6. Stake the threshold to the ground with the four (4) galvanized stakes provided in the vinyl hardware bag.
7. Keys for the cylinder lock and allen tool for dogging the panic bars are packed in the hardware bag.
8. Door alignment may need periodic adjustments during normal use.
Ambassadoor
Eave Purlin
Door adapter assembly - one for
each vertical connector tube.
5M
Vertical connector tube in-
serted into jamb. (typ. 2)
Vinyl Wall
Figure 1
Figure 2
EC 3554
AMBVMS SW 02-08