Importante important – JLG X14J Operator Manual User Manual
Page 142
8.3.1 H
OW AND WHERE TO ATTACH THE PLATFORM
To lift the platform it must be attached to each stabiliser using the appropriate fixing rings as
indicated in the photo below.
All four feet must be attached, otherwise the machine may not be balanced. Moreover, it is
obligatory to use four different ropes, chains or slings; in this way, breakage or incorrect
anchorage of one connection device would not cause dangerous load movements.
8.3.2 W
HAT TO USE TO ATTACH THE PLATFORM
The lifting devices must be in good working order and used according to the specifications
supplied by the manufacturer. As the weight of the platform is not distributed equally over
the four stabilisers, the minimum required capacity for the four ropes, chains or slings used
must not be less than 600 kg and they must be minimum 2,5 m long and all identical.
The slings cannot be more than 40 mm wide, the chains not more than 25 mm, and the rope
diameter cannot exceed 25 mm.
The use of ropes, chains or slings less than 2,5 m long may cause permanent damage to the
machine stabilisers.
X14JR0420113
138
BOOM LIFT MODELS X14J
JLG
IMPORTANTE
IMPORTANT