IKA C 5000 control Package 2/12 User Manual
Page 43

IKA
-WERKE C 5000 control/duo-control Ver. 10 04.07
3DJH
)LOOLQJ WKH V\VWHP FLUFXLW
c
The liquid with which the system is filled must be prepared as follows (about 5 liters
per measurement cell):
•
Fill a clean container with about 2.5 liters of distilled water
•
Add 5 ml of Aqua-Pro
•
Add the remaining 2.5 liters of distilled water to the container
•
Stir the mixture, or close the container and shake
A clean container that can be grasped easily should be used to fill up the system
circuit with liquid. Open the cover of the expansion container by rotating and add 1
liter to the expansion container of the measurement cell.
)RU WKH 'XRFRQWURO PHDVXUHPHQW FHOO VKRXOG EH WXUQHG RII ILUVW IRU WKH ILUVW
ILOOLQJ 0HDVXUHPHQW FHOO VKRXOG QRW EH WXUQHG RQ DQG ILOOHG XS XQWLO WKH SUR
FHGXUH IRU ILOOLQJ XS FHOO KDV EHHQ FRPSOHWHO\ ILQLVKHG
d
Connect the power plug with the power source. Turn on the measurement cell on
the power switch (the cooling unit will not be turned on yet at this point).
The system begins to boot up. The cover of the measurement cell opens automati-
cally and the opening screen appears on the display of the control console. You
must confirm the opening screen with the
2.
key.
☞
¢¡¤£¦¥¨§
¥¤©¤£V£$Y¨¡¤"¦¥'¨§
¥
6¥
"¦§
¥¤£¦