Installation diagram(for installation personnel), Caution, Warning – Defi Link Meter User Manual
Page 27: 6.how to install(for installation personnel), Installation diagram

80
white color
black color
orange color
red color
unused
yellow color
black color
white color
orange color
orange color
white color
black color
yellow color
● INSTALLATION DIAGRAM(for installation personnel)
Installation diagram
Meter
Meter holder
Meter wire
Control Unit Ⅱ(rear view)
*DF05001:
black
Power supply wire
Huse 4A
Red : Battery
(To 12V battery wire)
Orange : IGN
(To 12V wire when
ignition on)
White : Illumination
(To 12V wire when small
lamp is on)
Black : GND
(To ground, negative
battery terminal)
●Please read the safety warnings thoroughly for the installation and handling. Improper
installation or operation could cause the product to fall and damage the vehicle.
Control Unit Ⅱ
Sensor wire connections
position
CAUTION
M-WARNING
(white)
TACHOMETER (white)
WATER TEMP. (blue)
EXHAUST TEMP.(black)
OIL TEMP.
(white)
FUEL PRESS. (blue)
OIL PRESS.
(black)
(white)
DC SOURCE
(white)
METER OUTPUT1(white)
METER OUTPUT2(white*)
●Insert the wire that matches the wire connections position indicated on the side of
the control unit.
The unit will not function with incorrect connections.
●Pull out each connector with pressing the lock of the connector firmly.
●Put the connector of INTAKE MANIFOLD PRESS’s sensor wire in TURBO
connector(white) of Control Unit Ⅱ.
WARNING
TURBO(BOOST)/
INTAKE MANIFOLD PRESS.
Defi-Link
Meter
Defi-Link
Meter BF
6.HOW TO INSTALL(for installation personnel)