Operating procedures, 1 power source, 2 preparation for embroidering – Brother BE-1201B-AC-PC User Manual
Page 184
7-2
BE-0901E-AC-PC• BE-1201B-AC-PC
Chapter 7 Operation of Machine
1. Turn the power on to the machine.
2. When the machine is equipped with the
shut-off switch unit, Reset the emergency
stop button.
3. When the machine is equipped with the
shut-off switch unit, Press the power
switch.
4. The power lamp lights up and a message is
displayed on the LCD.
BE-1201B-AC-PC
W1604
BE-0901E-AC-PC
W1605
• The alarm sounds three times and the
presser foot move upward. Then the
hoop moves to the zero point and the
sewing data screen is displayed.
Note) When turning the power off and back it
on again, wait for at least 10 seconds.
1. Operating Procedures
1-1 Power Source
W1262Q
Shut-off switch unit
W1606
1-2 Preparation for Embroidering
1. Select embroidering data while the machine is in the waiting state for an embroidering data
selection, and transmit required data by pressing the
icon.
2. The READY lamp lights up and the machine is placed in the waiting state.
3. Pressing
, determine a position to start embroidering.
An error code is displayed in the display window if a pattern comes out of the hoop.
4. Pressing
starts embroidering.
During embroidering, the speed is indicated in the display window.
5. After embroidering is finished, the machine is placed in the stand-by state.
Emergency stop switch
Power switch