4. Use rebar or other appropriate material to ensure

that the concrete foundation will be sufficiently

connected to the existing floor.

5. If desired, prepare a form for the above-ground

portion of the foundation and fill form and

excavation with concrete to join the foundation.

Verify that top of foundation is level. The height

of the foundation must not exceed 8 inches

(203 mm).

6. Use the mounting bolt layout to properly position

the mounting bolts in the wet concrete.

NOTE: When using any anchoring bolts, allow 1.5

inches (38 mm) to extend above the surface of the

concrete. Refer to the Machine Anchoring section.

7. Allow concrete to dry and cure before machine is

placed into service.