Installing the at-rps2004 unit – Allied Telesis AT-8350GB User Manual
Page 74

Installation
74
Installing the
AT-RPS2004
Unit
Note
Make sure you install the redundant power supply close enough to
your switch so that you can connect all power cords to the switch
and to the power outlet. We recommend that you install the
redundant power supply directly above or below your AT-8350GB
switches or in a directly adjacent rack.
Perform steps 1 to 6 in the following procedure to install the optional
AT-RPS2004 redundant power supply unit in a standard 19-inch
equipment rack. If you are not installing the power supply in a rack, go to
step 7.
1. Unpack the AT-RPS2004 power supply from its shipping container
and store the packaging material in a safe location.
Note
You must use the original shipping material if you need to return
the module to Allied Telesyn.
2. Check that the package includes all the items listed below. If any item
is missing or damaged, contact your Allied Telesyn sales
representative for assistance.
One RPS2004 Redundant Power Supply
Power cord (Americas, EC, Australia, and UK only)
RPS cable
Installation Guide
Warranty card
1
2
3
4
FAN
RPS