beautypg.com

Selecting a site for the switch – Allied Telesis AT-8350GB User Manual

Page 54

background image

Installation

54

Selecting a Site for the Switch

Observe the following requirements when choosing a site for your
switch:

‰ If you plan to install the switch in an equipment rack, check to be

sure that the rack is safely secured and that it will not tip over.
Devices in a rack should be installed starting at the bottom, with
the heavier devices near the bottom of the rack.

‰ If you are installing the switch on a table, be sure that the table is

level and secure.

‰ The power outlet for the switch should be located near the unit

and should be easily accessible.

‰ The site should allow for easy access to the ports on the front of

the switch. This will make it easy for you to connect and
disconnect cables, as well as view the switch’s LEDs.

‰ To allow proper cooling of the switch, air flow around the unit and

through its vents on the side and rear should not be restricted.

‰ Do not place objects on top of the switch.

‰ Do not expose the switch to moisture or water.

‰ Make sure that the site is a dust-free environment.

‰ You should use dedicated power circuits or power conditioners to

supply reliable electrical power to the network devices.

‰ When stacking switches, a common power source such as a

power strip is recommended for all of the switches in the stack.