beautypg.com

Leds and management software initialization – Allied Telesis 8100S Series User Manual

Page 88

background image

Chapter 5: Powering On the Switch

88

The base port LEDs are on in phases 1 and 2 if they are connected to live
network devices. Otherwise, they are off. The 10/100/1000Base-T port
LEDs are on in phase 1 regardless of whether they are connected to
active network devices.

You may also monitor the processes by connecting a terminal or computer
that has a terminal emulator program, to the Console port on the master
switch. You will see the messages in Figure 35 on page 89 and Figure 36
on page 90.

Table 16. LEDs and Management Software Initialization

LEDs

Initialize Management

Software

Initialize

Features

Load

Configura-

tion File

Phase 1:

15 seconds

Phase 2:

15 seconds

Phase 3:

10 seconds

Phase 4:

varies

Base port LEDs

On

On

Off

Off

10/100/1000Base-T port
and SFP slot LEDs

On

Off

Off

Off

Stack ID LED

Power cycle

Off

Off

Flashing

On

RELOAD or
RESET command

On

On

Flashing

On

This manual is related to the following products: