Leds and management software initialization – Allied Telesis 8100S Series User Manual
Page 88

Chapter 5: Powering On the Switch
88
The base port LEDs are on in phases 1 and 2 if they are connected to live
network devices. Otherwise, they are off. The 10/100/1000Base-T port
LEDs are on in phase 1 regardless of whether they are connected to
active network devices.
You may also monitor the processes by connecting a terminal or computer
that has a terminal emulator program, to the Console port on the master
switch. You will see the messages in Figure 35 on page 89 and Figure 36
on page 90.
Table 16. LEDs and Management Software Initialization
LEDs
Initialize Management
Software
Initialize
Features
Load
Configura-
tion File
Phase 1:
15 seconds
Phase 2:
15 seconds
Phase 3:
10 seconds
Phase 4:
varies
Base port LEDs
On
On
Off
Off
10/100/1000Base-T port
and SFP slot LEDs
On
Off
Off
Off
Stack ID LED
Power cycle
Off
Off
Flashing
On
RELOAD or
RESET command
On
On
Flashing
On