2dimensions and installation – Horner APG SmartBlock HE-579ACM300 User Manual
Page 2

PAGE 2
12 May 2011
MAN0951-02
HE-559ACM300
Information is subject to change without notice.
2
DIMENSIONS AND INSTALLATION
Network, Power and Grounding:
A single 5 pin connector is used to make both a network connection and power input. A quality class 2
power supply should be used for this product. If the power is run with the network cable, care must be
taken such that the voltage does not drop below the lower supply limit on longer runs.
A quality protective earth ground is required for safe and proper operation. The best protective earth
ground is achieved by screwing the lower left grounding location into a grounded back plate. Alternately
a protective earth ground can be connected to the spade lug.
Please see Horner manual MAN0799 for details on CAN wiring.
CAN Network & Power Port Pin Assignments
Pin
Signal
Signal Description
Direction
1
V-
CAN and Device
Ground - Black
!
2
CN_L
CAN Data Low - Blue
In/Out
3
SHLD
Shield Ground - None
!
4
CN_H
CAN Data High - White
In/Out
5
V+
Positive DC Voltage
Input (10-30VDC) - Red
!
4.56”
(115.8mm)
4.48”
(113.7mm)
2.16”
(54.8mm)
With connector
2.84”
(72.1mm)
CAN Network & Power
Connector
Torque rating 4.5 – 7 Lb-In
(0.50 – 0.78 N-m)
J1
CTs and Relay
J2
Voltage Inputs
Can and
Power
Connector
Network ID
Selector
Switches
Status LEDs
Earth Ground
Location