beautypg.com

Index – HP Integrity BL870c Server-Blade User Manual

Page 47

background image

Index

A

Air conditioning,

11

Anchor holes

,marking concrete floor,

20

drilling into concrete floor,

20

tools required,

19

C

Communications interference,

13

Cooling assessment,

11

D

Dust and microscopic particles,

13

E

Electrostatic discharge,

14

F

Floor anchoring,

19

Flooring,

12

G

Ground cables

and star washers,

38

inside seismic rack,

38

H

Hot spots,

11

M

Metallic particulate contamination,

13

O

Operational space,

12

P

Particulates, metallic,

13

R

Rack see seismic rack
Raised floors, requirements for,

12

Receiving and unpacking,

12

S

Seismic rack

anchoring to floor,

19

bolting to the floor,

31

casters,

26

door,

22

eyebolts,

26

ground cables

internal,

38

ground connections,

16

grounding,

36

grounding rails,

16

,

38

kickplate,

24

payload limit,

9

positioning,

30

side panels,

24

specifications,

15

unpacking,

22

Site ground,

36

Site power cables

reference documentation,

46

requirements,

46

Specifications

environmental,

15

rack,

15

Star washers

and ground cables,

38

T

Tools

for connecting cables,

17

for installing cabinets,

17

W

Weight calculation,

12

Z

Zinc, cadmium, or tin particulates,

13

47