HP Integrity BL870c Server-Blade User Manual
Page 32
4.
For the seismic rack only: Install the blank drip trays provided in the hardware kit over unused
anchor holes in the base of the rack using the provided nuts.
5.
For the seismic rack only: Place the anchor rod assembly and washer kit into the anchor holes.
See
for proper stackup.
For the seismic rack R2 only: Place the concrete anchor bolt with washer kit into the anchor
holes. Use the same washer stackup shown in
Figure 1 Concrete Anchor Rod Assembly
8
Threaded cone
1
12 mm bolt head
2
Threaded concrete anchor rod
9
Concrete floor
10
Rack leveling foot
3
Large plate washer
4
Metal drip plate (included in rack
accessory kit)
11
Rack base
12
Nylon insulator bushing
5
Metal sleeve
13
Spring washer
6
Plastic sleeve
7
Expansion sleeve
6.
Using a hammer, tap the bolts into the holes. Stop when the bolts are firmly seated in the floor.
7.
For the seismic rack: Use a 19 mm socket to torque the anchor bolt to 58 ft-lbs (77 N-m). If
the anchor bolt has a red cap, the red cap will break off when torqued to the correct amount.
For the seismic rack R2: Using a 24-mm socket, torque the anchor bolt to 58 ft-lbs (77 N-m).
The anchor bolt's red cap will break off when torqued to the correct amount.
8.
Reconnect the ground wire to the kickplate and install the kickplate at the bottom of the rack.
32
Installing the Seismic Rack