beautypg.com

HP ProLiant ML110 G2 Server User Manual

Page 29

background image

Hardware options installation 29

6.

Secure the cable with the cable tie.

7.

Install the access panel.

8.

Power up the server (on page

6

).

Installing the LED cable (ML110 G5, ML115 G5, and ML150 G5)

Connector locations (ML110 G5, ML115 G5, and ML150 G5)

HP ProLiant ML110 Generation 5 Server