Hard drive led cable option – HP ProLiant ML110 G2 Server User Manual
Page 23
Hardware options installation 23
5.
Install the hard drive.
6.
Close the bezel.
7.
Resume normal server operations.
8.
Determine the status of the drive from the hot-plug SAS hard drive LED combinations ("
" on page
).
Hard drive LED cable option
This section provides the following procedures:
•
Installing the LED cable (ML110 G4) (on page
•
Installing the LED cable (ML150 G3) (on page
•
Installing the LED cable (ML110 G5, ML115 G5, and ML150 G5) (on page
This manual is related to the following products: