beautypg.com

Index – American Power Conversion PDU User Manual

Page 51

background image

Index

150kW InfraStruXure System—Installation and Start-Up

43

A

Applying power to the system 33–

34, 37–38

Automatic transfer switches,

installing 25

C

Cable ladders, installing 24
Ceiling clearance 6
Circuit breaker size 2

D

Dimensions

InfraStruXure PDU 5
NetShelter VX enclosure 5

E

Electrical requirements 9
Emergency power off (EPO)

connecting the switch 17–20
overview 10
problems with 19
safety warnings 20

EMI warnings 4
Environmental management

system, installing 25

Environmental monitoring unit,

installing 25

F

Front clearance, minimum value 6

I

InfraStruXure Manager

configuring the 35
installing 25
routing data cables to the 30

InfraStruXure PDU

dimensions 5
electrical requirements 9
heat output 8
level the 13
maximum weight 7

Input conductors

attaching conduit for the 14–15
routing to the main input circuit

breaker 16

Input contacts

connect to the user connection

plate 21–22

Installation 13–30

connect the power source 14–16
connect user input contacts and

relay outputs 21–22

connecting an EPO switch 17–

20

install shielding troughs,

shielding partitions, and cable
ladders 23–
24

level the PDU and NetShelter

enclosures 13

overview of basic procedure 11–

12

rack-mount devices 25
route and attach overhead wiring

26–28

warnings for 2
wiring under the floor 29

M

Main input breaker, accessing the 14
Maintenance, warnings 2
Moving the PDU, warnings 2

N

NetShelter VX enclosure

dimensions 5
level the 13
maximum weight 7

O

Operation 37–39

P

Power cables, routing to equipment

racks 26–28

Power source, connecting to the

PDU 14–16

R

Rack PDUs, installing 25
Rear clearance, minimum value 6
Receiving the PDU, warnings 2
Relay outputs

connecting to the user

connection plate 21–22

S

Safety 1–4

during start-up 31
symbols used in this manual 1

Shielding partitions

dimensions 5
installing 24

Shielding troughs

dimensions 5
installing 23

Site planning 5–12

basic installation procedure 11–

12

dimensions 5
electrical requirements 9
Emergency power off (EPO) 10
heat output 8
space considerations 6
weight considerations 7

Start-up procedure 31–34

T

Torque specifications, for wiring 16
Total power off procedure 3, 31–32,

39