KROHNE ALTOFLUX 2W IFM 4042K EN User Manual

Page 8

background image

Section 1.5

Part A Installation and Start-up

ALTOFLUX 2W

02/2001

8

1.5

Installation in the pipeline

Installation material not included, to be provided by customer

(stud bolts, nuts, gaskets, etc.).


Pipe flanges and operating pressure: refer to “limits“ tables in Section 5.6


Distance between pipe flanges:

see fitting dimension a in Section 5.5 “Dimensions and weights“


High-temperature service

Where process temperatures exceed 100°C/212°F, provide facilities to compensate for
longitudinal expansion on heat-up of the pipeline.

For short pipelines, use resilient gaskets, and

for long pipelines install flexible pipe elements (e.g. elbows).


Flange position:

Install flowmeter in line with pipe axis.

Pipe flange faces must be parallel to each other.


Gaskets

No additional gaskets required for primary heads fitted with tube liners of Teflon

®

- PFA or

Teflon

®

- PTFE. Refer to Sect. 1.6 for torques.


Grounding rings / protection rings (option)

On plastic pipelines and internally coated metal pipelines, grounding rings are required to
form the conductive connection with the process liquid. Refer to Sect. 7 “Grounding“ for

electrical connection.

Please note:

The cylindrical neck must be inside the measuring tube
(to protect the liner, particularly at the inlet edge).