Installation, 9 mounting of converter – KROHNE OPTISONIC 6300 Quickstart EN User Manual
Page 16
1
INSTALLATION
16
OPTISONIC 6300
www.krohne.com
07/2009 - 7.30959.24.00 - QS OPTISONIC 6300 R04 en
1.9 Mounting of converter
1.9.1 Mounting of UFC 300 F
Perform the following procedures:
• Mount converter with mounting plate on wall or standpipe.
• Observe maximum allowed length of 30 m / 98.4 ft for the signal cable
1.9.2 Turning the display of the field housing version
The display of the field housing version can be turned in 90° increments.
1 Unscrew the cover from the display and operation control unit.
2 Using a suitable tool, pull out the two metal puller devices to the left and right of the display.
3 Pull out the display between the two metal puller devices and rotate it to the required position.
4 Slide the display and then the metal puller devices back into the housing.
5 Re-fit the cover and tighten it by hand.
CAUTION!
Always use the supplied signal cable. Keep the distance between the sensor and the signal
converter as short as possible.
Figure 1-14: Turning the display of the field housing version
CAUTION!
The ribbon cable of the display must not be folded or twisted repeatedly.
INFORMATION!
Each time a housing cover is opened, the thread should be cleaned and greased. Use only resin-
free and acid-free grease.
Ensure that the housing gasket is properly fitted, clean and undamaged.
.book Page 16 Wednesday, August 19, 2009 8:37 AM