WARNING
To prevent electrical shock, do not connect power
until instructed to do so.
Installation
Safety Message to Installers, Users, and Maintenance Personnel
The Chameleon DeviceNet Status Indicator must be installed in accordance with the latest edition of the National
Electrical Code and/or other applicable local regulations, by a trained and qualified electrician. The selection of the
mounting location, its controls and the routing of the wiring is to be accomplished under the direction of the facilities
engineer.
WARNING
To prevent electrical shock, do not connect to the
system when power is on.
NOTE: For NEMA 4X applications, it is recommended that the unit be conduit mounted vertically facing up.
1.If not using the optional 102PMF mounting kit, mount the base by installing on 3/4" (19 mm) conduit (not supplied).
Pull field wiring (if required) and DeviceNet wiring through the conduit entrance hole.
1.If using the 102PMF mounting kit, perform the following:
NOTE: All references below are to Figure 1.
a.Using the supplied gasket (D) as a guide, mark the four mounting holes and the center clearance hole on an
appropriate surface.
b.Punch the four mounting holes.
Punch the wiring clearance hole in the mounting surface to be sufficiently
larger than that in the gasket to ensure the wiring insulation is protected from abrasion by the gasket (without
interfering with the mounting screw holes), or provide other appropriate wire insulation abrasion protection as
needed.
c.Screw the pipe extension (purchased separately) into the mounting flange.
d.Ground the flange by pulling the ground wire through the mounting surface clearance hole and center hole of
the gasket. Connect earth ground to the bottom of the base mount flange using the ground screw (G) and wire
retention terminal cup washer (H).
e.Pull the remaining field wiring through center clearance hole of mounting surface, center hole of the gasket,
pipe mount flange and extension pipe.
f.Align the mounting gasket (D) and flange (A) on the panel.
Secure using (4) #10-24 x 1" (25 mm) pan head
screws (B), (4) external tooth #10 star washers (E) and (4) #10-24 hex nuts (F).
g.Mount the base as instructed below.
Network & Field Connections
CAUTION
Observe precautions for handling electrostatic
sensitive devices while handling printed circuit
boards.