beautypg.com

Ft5000 – Triton FT5000 PC-BASED ATM Installation Manual User Manual

Page 3

background image

3

FT5000

XP

- S

ITE

P

REPARATION AND

I

NSTALLATION

G

UIDE

I

NTRODUCTION

This document contains the information necessary for the preparation and in-

stallation of an FT5000

XP

Triton ATM. It’s important that the site complies with

the requirements specified in this document. In addition, electrical wiring and

mechanical systems must also comply with all relevant laws and regulations.

The site must be prepared by the customer or his agent who is fully conversant

with the requirements of installing through-the-wall ATM equipment. The re-

sponsibility for ensuring that the site is prepared in compliance with this docu-

ment remains with the customer.

For information and guidance only, a list is provided in general terms of those

matters for which the customer is responsible. The list is not intended to be

comprehensive and in no way modifies, alters, or limits the responsibility of the

customer for all aspects of adequate site preparation.

1.

Location of the equipment and site preparation.

2.

Site wiring (power, communication).

3.

Location of other equipment that may cause electrical, electromagnetic

or heat induced interference.

4.

Make building alterations to meet wiring and other site requirements.

5.

Install all communication cables, wall jacks, and associated hardware.

6.

Provide and install necessary power distribution boxes, conduits and

grounds.

7.

Ensure all applicable codes, regulations and laws (electrical, building,

safety) are adhered to.

8.

Ensure the environmental requirements of this unit are met.

9.

Install the unit at a height which meets the ADA accessibility regula-

tions for the state/country installed.