Rack installation for a Brocade VDX 6730

2

3. Place the switch on a flat, sturdy surface.

4. Provide power to the switch as described in

“Providing power to the switch”

on page 12.

ATTENTION

Do not connect the switch to the network until the IP address is correctly set. For instructions on how
to set the IP address, see

“Setting the switch IP address”

on page 17.

Rack installation for a Brocade VDX 6730

Follow the installation instructions shipped with the appropriate rack mount kit:

To install the switch into a 4-post fixed-rail rack, refer to the Fixed Rack Mount Kit (24”-32”)
Installation Procedure
or the Fixed Rack Mount Kit Installation Procedure.

To install the switch into a 2-post Telco rack, refer to the Flush Mount Rack Mount Kit
Installation Procedure
.

Providing power to the switch

Perform the following steps to provide power to the Brocade VDX 6730.

1. Connect the power cords to both power supplies, and then to power sources on separate

circuits to protect against failure. Ensure that the power cords have a minimum service loop of
15.2 cm (6 in.) available and are routed to avoid stress.

2. Power on the Brocade VDX 6730-32 by turning both on/off switches to "I." The Brocade VDX

6730-76 powers up automatically when plugged in. The power supply LEDs display amber until
POST is complete, and then change to green. The switch usually requires several minutes to
boot and complete POST.

ATTENTION

Power is supplied to the switch as soon as the first power supply is connected and powered on.

3. After POST is complete, verify that the switch power and status LEDs on the left of the port side

of the switch are green. Refer to

Figure 1 on page 5

and

Figure 3 on page 6

for the specific

location of these LEDs.

Verifying operation

After you have powered on the system and POST is complete, verify that the switch is working
properly.

1. Verify that the power supply LEDs are solid green. See

Figure 6 on page 26

and

Figure 9 on

page 28

for the location of these LEDs.

2. Verify that the system power LED and the system status LED are solid green. See

Figure 5 on

page 26

and

Figure 7 on page 27

for the specific locations of these LEDs.

3. The port LEDs should be lit during POST activities. When POST is complete, only the LEDs for

ports connected to other devices should be green. See

Figure 5 on page 26

,

Figure 7 on

page 27

, and

Figure 8 on page 27

for the specific locations of these LEDs.