Yokogawa IR200 User Manual
Page 25
3 - 12
IM 11G02M01-01E
Terminal block 4
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
(M3.5 screw)
Unused
Auto calibration status
contact output
(DO)
Calibration error
contact output
(DO)
Pump ON/OFF contact
output (DO)
Unused
Contact output for
zero calibration
(DO)
Contact output for CH1
span calibration
(DO)
Contact output for CH2
span calibration
(DO)
Contact output for CH3
span calibration
(DO)
Contact output for CH4
span calibration
(DO)
Terminal block 4
Between 1 – 2
: CH4 span calibration contact
output
Between 3 – 4
: CH3 span calibration contact
output
Between 5 – 6
: CH2 span calibration contact
output
Between 7 – 8
: CH1 span calibration contact
output
Between 9 – 10 : Zero calibration contact output
When the calibration contact
output is measured with manual
calibration, the calibration
contact corresponding to cali-
bration channel is conductive.
For the automatic calibration,
they are worked sequentially
according to “6.4 Auto calibra-
tion setting”. If calibration is
not performed, all of them are
open.
Between 11– 12 : For internal connection. Must
not be wired. (Must not be used
as junction terminal.)
Between 13– 14 : Automatic calibration in
progress, contact output. Con-
ductive during automatic
calibration. Open otherwise.
Between 15– 16 : Calibration error contact output.
Conductive when error is
produced at zero or span calibra-
tion. Normally open.
Between 17– 18 : Pump ON/OFF contact output.
(Used for turning ON/OFF the
pump. Conductive during
measurement and open at zero
span calibration.)
Note:
For the output of calibration contacts, see
Item 3.5 (9) “Timing of calibration
contact output”.