beautypg.com

Attachment, 1 installation of main unit – IAI America RCLE-GR5L User Manual

Page 21

background image

15

6. Attachment


Mount the unit so the fingers comes down at the bottom.

6.1 Installation of Main Unit


There are threaded holes prepared for attachment on the 3 surfaces of the main unit. Choose the
suitable ones to install the unit.
The effective thread depths differ for each attachment surface. Refer to the drawing to determine
the screw length. For the installation of the unit, make sure that attachment surface is a machined
surface or a surface with an equivalent accuracy.

Tightening Torque

Bolts to be

used

When Attachment Surface is Steel

When Attachment Surface is Aluminum

M3

154N•cm (15.8kgf•cm)

83N•cm (8.47kgf•cm)

4-M4, Depth 5

40

53

6.5

6.5

16.6

25.6

4.5

4.5

13.5

26

13.5

4-M3, Depth 5

(Same on Opposite Side)

19

7.6

30.6

34.6