beautypg.com

D. start-up instructions – HTP ELP-199 User Manual

Page 55

background image

55

LP-294 REV. 2.20.14

Figure 30

– Display Navigation Summary

DISPLAY KEY DETAILS

To enable editing, navigate to the desired parameter and hold down the ENTER key for one second. When the ENTER key is released,
the parameter value will begin to blink. The parameter can now be changed using the

▼▲ ARROW keys. After the desired value is

displayed, press the ENTER key for 1 second to lock the new value of the function in. The value will then stop blinking.

ARROW KEYS

– The ▼▲   arrow keys are used to navigate between the different menus and parameters.


 keys are also used in programming modes to change between the programmable functions, and shift from menu to menu. Also,

the  key, when pressed and held in conjunction with the ENTER key for three seconds, opens the Installer Menu. If you are lost in the
control structure, pressing the  key repeatedly will return you to the Main Menu.

▼▲ are used to navigate between the various parameters displayed in each menu. In addition, after the function is enabled for editing
by pushing the ENTER key, the

▼▲ keys are used to adjust the value upward or downward to the desired amount. It is recommended

you use the Menu Maps in this manual and the detailed menu instructions printed in this section to help in menu navigation.

To enter the Installer Menu, press the  key until you reach the Main Menu. Press and hold the ENTER key at one of the Main
Screens. While holding ENTER, press and hold the  key. After three seconds, the Installer Menu will open.

NOTE: The Installer Menu cannot be opened from the User Menu.

If you get lost in the control structure, press the  key. Pressing the  key twice from the Installer Menu will return you to the Main
Menu.

D. START-UP INSTRUCTIONS

Before operating the boiler, it is important to remove the cover and verify that the gas line and water lines are connected and that there
are no leaks. If you smell gas, STOP. Follow the safety instructions listed at the beginning of this section. If you do not smell gas, follow
the next steps.

1. Turn down the thermostats before applying power to the boiler. If 0

–10 volt or other inputs are used, make sure that they are set so

there is no call for heat while programming.

2. Turn on the power to the boiler or boilers if a cascade system is used.

NOTE: To avoid any start-up issues, purge the system of air and review and appropriately set the following settings and parameters at
first power up.

This manual is related to the following products: