Reese 30073 RAIL KIT User Manual
Page 10

10
30073N – 13DEC06D
PCN9360
©2006 CEQUENT TOWING PRODUCTS, INC.
Litho in USA
16.
Drill pilot holes in truck bed at prick mark locations. With hole saw saw 2 1/2” hole centered at pilot holes.
Note: Consult installer for recommended curing time on spray-in liner before cutting holes through bed.
Optional: Spray under coating around 2 1/2” holes to prevent rusting.
17.
Loosely reattach rails to frame bracket.
18.
From truck bed attach pucks and trim rings to rails as shown in
Figure 21
using 5/8” button head screw and
lock washer. Tighten to 110ft.lbs. torque.
19.
Insert puck plugs in plugs whenever pucks are not in use. (
Figure 22
)
20.
Install
Signature Series
5th wheel per hitch assembly instructions.
21.
Torque hitch assembly bolts per hitch instructions.
22.
Torque all 5/8” rail kit hex bolts to 170ft.lbs
23.
Replace any brake lines and spare tire that may have been removed/relocated.
WARNING:
DO NOT lubricate threads. It may cause bolt failure.
CAUTION:
Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural
members, etc.
CEQUENT TOWING PRODUCTS
does its best to communicate tow vehicle manufacturer
changes; however, it is ultimately the responsibility of the installer to prevent damage due to installation.
15.
Remove 5/8” x 1 1/2“ bolts attaching frame bracket to mounting rails. Remove front rail as per instructions in
step 7. Move rear rail rearward or forward to prevent interference with hole drilling or punching of truck bed.
Figure 21
5/8” BUTTON HEAD
4 PLACES
PUCK
4 PLACES
TRIM RING
4 PLACES
5/8” LOCK WASHER
4 PLACES
Figure 22
Truck Bed
Puck Plug
Puck Assembly