beautypg.com

Teledyne 6700-C Total Organic Carbon Analyzer (Hi-Temp Combustion version) User Manual

Page 28

background image

Installation/Startup

Model 6700C TOC

Teledyne Analytical Instruments

28

CAUTION:

FAILURE TO OBSERVE THIS WILL RESULT IN
IMPROPER OPERATION OR A SAFETY HAZARD.


ELECTRICAL – Assure proper electrical installation.
SAFETY – All customer and TAI specified safety measures are

followed.

After all of the above checks, turn analyzer ON by activating the

facility power switch. Thereafter, follow the MENU on the display.

Ultimate stability of the analyzer will occur within a few hours,

although initial operation may proceed in one hour after the reactor
temperature reaches its set point.

Immerse the line from “sample” port of the Analyzer into a D.I.

water container. Immerse the acid line from the “ACID IN” port of the
Analyzer into an ACID container. (2N HCl)

Note: For “TC” only operation, No Acid is Required.

3.6 Shutdown

Prior to shutdown of the analyzer or service on the Reactor, flush

D.I. water through all sample and reagent lines.

CAUTION: FAILURE TO OBSERVE ADEQUATE FLUSHING

COULD RESULT IN HARMFUL ACID BURNS AND/OR
A REACTOR CLOG.