beautypg.com

MaxPower Corp Toshiba G9000 Series User Manual

Page 56

background image

46

G9000 Installation and Operation Manual

FIGURE 3.5 Diagram of Power Wire & Control Wire Connect ( Parallel Operation system connection )

UPS-1

IFAU-08

CN96

CN95

CN94

TLIN TLOUT

CBIN CAIN

CBOUT CAOUT

TN1

IOAU-09

5 6

A50
B50
C50

AC OUTPUT

UPS-2

IFAU-08

CN96

CN95

CN94

TLIN TLOUT

TN1

IOAU-09

5 6

A50
B50
C50

AC OUTPUT

UPS-n

IFAU-08

CN96

CN95

CN94

TLIN TLOUT

TN1

IOAU-09

5 6

A50
B50
C50

AC OUTPUT

UPS-3 CN96 (TLIN)

UPS-3 CN94 (CAIN)

UPS-3 CN94 (CBIN)

UPS-(n-1) CN96 (TLOUT)

UPS-(n-1) CN94 (CAOUT)

UPS-(n-1) CN94 (CBOUT)

A
B
C

UPS-1

A
B
C

UPS-2

A
B
C

UPS-n

AC OUTPUT

35
36
37
38

.
.
.

49
50

1

8

ON

1

8

OFF

1

8

ON

52L1-AX

52L2-AX

.
.
.

52Ln-AX

Critical Load Cabinet

CBIN CAIN

CBOUT CAOUT

CBIN CAIN

CBOUT CAOUT

*1 n : Maximum = 4

*2 Return from the last

UPS module to the first

UPS

module (continuous loop).

*3 DIP switch position

UPS-1 and UPS-n : ON

Otherwise : OFF

*

1

*1

*

1

*2

*

3

*

3

*

3

Use Ethernet STP (Shielded

Twisted Pair) Cable for all

communication cabling.

Use of UTP (Unshielded

Twisted Pair) Cable may

cause malfunction.

Total cable length

from UPS-1 to

UPS-n should be

within 100m.