Installation and operation, Transportation and installation, Installation procedure – MaxPower Corp Toshiba G9000 Series User Manual
Page 47
G9000 Installation and Operation Manual
37
3
INSTALLATION AND OPERATION
3.1
TRANSPORTATION AND INSTALLATION
TABLE 3.1 How to transport and install the system
Transportation
Installation
Transport unit with forklift.
If carry by overhead crane, use four M12
eyebolts. (Not provided)
Using the pre-drilled four holes in the UPS
channel base, anchor the unit using
appropriate hardware. (Not provided)
Do not transport UPS cabinet laid horizontally.
Cabinets must be maintained upright within +/- 15° of the vertical
during handling
.
3.2
INSTALLATION PROCEDURE
A) Note the load tolerance of the floor
Refer to Table 3.2 for list of UPS weights.
TABLE 3.2 List of UPS weights
UPS Capacity (kVA)
80
100
160
225
Weight (lbs)
855
855
1160
1230
B) Minimum clearance required for ventilation
Right side
25 mm (1 inch) (not required when sidecars are used)
Left side
25 mm (1 inch) (not required when sidecars are used)
Back side
0.0 mm (0 inch)
Top side
500 mm (20 inches) (for air flow)
C) Space requirement for routine maintenance
Allow for the following space at the time of installation.
Front
1000 mm (40 inches)
Sides
0.0 mm (0 inch)
Back side
0.0 mm (0 inch)
Top side
500 mm (20 inches)
PROHIBIT
!
NOTE