background image

G9000 Installation and Operation Manual

37

3

INSTALLATION AND OPERATION

3.1

TRANSPORTATION AND INSTALLATION

TABLE 3.1 How to transport and install the system

Transportation

Installation

Transport unit with forklift.

If carry by overhead crane, use four M12

eyebolts. (Not provided)

Using the pre-drilled four holes in the UPS

channel base, anchor the unit using

appropriate hardware. (Not provided)

Do not transport UPS cabinet laid horizontally.

Cabinets must be maintained upright within +/- 15° of the vertical

during handling

.

3.2

INSTALLATION PROCEDURE

A) Note the load tolerance of the floor

Refer to Table 3.2 for list of UPS weights.

TABLE 3.2 List of UPS weights

UPS Capacity (kVA)

80

100

160

225

Weight (lbs)

855

855

1160

1230

B) Minimum clearance required for ventilation

Right side

25 mm (1 inch) (not required when sidecars are used)

Left side

25 mm (1 inch) (not required when sidecars are used)

Back side

0.0 mm (0 inch)

Top side

500 mm (20 inches) (for air flow)

C) Space requirement for routine maintenance

Allow for the following space at the time of installation.

Front

1000 mm (40 inches)

Sides

0.0 mm (0 inch)

Back side

0.0 mm (0 inch)

Top side

500 mm (20 inches)

PROHIBIT

!

NOTE