In the event of a UPS module failure during Parallel Operation, the critical load power will be

continually supplied and shared by all other UPS.

The Bypass Input breaker and cables are to be supplied and installed by the user or

the constructor. (See WARNING 4 on page 1-4)

B) Bypass Operation: Load Power supplied through UPS internal static bypass line.

FIGURE 1.2

Single Line Diagram - Bypass Operation: Load fed through static bypass

line.

Figure 1.2 shows the Internal Bypass line is a Hard-wired line through 52S which supplies the

critical load with unconditioned bypass input power. Upon switching to the Internal Bypass line, the

Static Transfer Switch line through CB3 (herein after STS contactor CB3) supplies the power

immediately, and then the Internal Bypass line through 52S supplies the power. In the event of a

switching to the Bypass line, the power to the critical load will be uninterrupted. The purpose of this

Internal Bypass line is to route power to the critical load while the UPS module is de-energized

(converter and inverter), and during Start-up before the system is fully operational.

Each UPS internal static bypass line will equally share the power supplied to the critical load

whenever the system is in the Parallel Operation.

UPS Module

Power

Flow

Not in Use

AC input

CB

CB3

CONVERTER
/ CHARGER

INVERTER

Output

52C

CB1

External

BATTERY

User supplied

MCCB

Static Transfer

Switch

52S

CB2

Battery Cabinet

Bypass

input

CB

User supplied

MCCB

!

NOTE