beautypg.com

This control box must be properly grounded, Chassis ground, Input power wire – Controlled Products Systems Group 4302-111 User Manual

Page 11: Ac power switch, Ac power connection, Main terminal, Battery plug, Primary operator connection only, Secondary operator connection only, Ul 325 terminal

background image

4302-065-F-1-13

9

1.1 Control Box Wiring Overview

SECTION 1 - WIRING

Before attempting to connect any wiring to the control box, be sure that the circuit breaker in the electrical panel is in the OFF
position. Permanent wiring must be installed to the control box as required by local electrical codes. It is recommended that a
licensed electrical contractor perform this work.
Since building codes vary from city to city, we highly recommend that you check with your local building department prior
to installing any permanent wiring to be sure that all wiring to the control box (both high and low voltage) complies with
local code requirements.

THIS CONTROL BOX MUST BE PROPERLY GROUNDED!!

1

2

3

4

5

6

7 8

9 10 11 12 13 14 15 16 17 18 19 20

RED 24V RED

BLK 115V WHT

Chassis

Ground

See page 15.

Input Power Wire

See page 15.

Conduit

1

7

6

5

4

3

2

12 V

o

lt 3 Amp/Hr Batter

y

12 V

o

lt 3 Amp/Hr Batter

y

AC Power Switch

See page 15.

AC Power

Connection

See page 15.

Main Terminal

See pages 12-13.

Battery Plug

See page 15.

PRIMARY Operator

Connection ONLY

See page 10.

SECONDARY Operator

Connection ONLY

See page 10.

UL 325 Terminal

See page 11.

“Optional” DoorKing

Plup-In Loop Detectors

See page 14.

This manual is related to the following products: