Plumbing and connection options – Hach-Lange PHOSPHAX indoor sc User Manual
Page 75

75
Plumbing and connection options
3. Install the second sc analyzer (Analyzer 2):
a. Feed the heated drain hose from Analyzer 1 through
Analyzer 2 (item 12). Use Seal Plug #1 to secure.
b. Feed the second heated drain hose through Analyzer 2
(item 11). Use Seal Plug #1 to secure.
c. Seal the remaining opening with Seal Plug #3.
d. Connect the heated drain power connections. Refer to
e. Cut 25 mm from the drain tube that was removed from
Analyzer 1. Connect the 25 mm piece of tubing to the
T-fitting on Analyzer 2. Connect the other end of the tubing
to the T-fitting that was removed from Analyzer 1. Refer to
for T-fitting removal.
f.
Connect the drain tube from Analyzer 1 and the drain tube
from Analyzer 2 to the T-fitting.
4. Connect the sample line from Analyzer 1 to the bottom inlet on
the overflow vessel.