3 mechanical installation, 1 mount the instrument, 1 wall mount – Hach-Lange PHOSPHAX indoor sc User Manual
Page 14: Installation

14
Installation
3.3 Mechanical installation
Select a suitable place to install the instrument. Plan the
mechanical installation before positioning posts or drilling holes.
Refer to
Make sure that the fastening has sufficient load bearing capacity
(approximately 160 kg). The wall plugs must be selected and
approved to suit the properties of the wall.
Plan cable and tubing routes to avoid sharp bends and tripping
hazards.
When connecting two analyzers (e. g. for measuring two
parameters with a FILTRAX or Ultrafiltration), plan where the
instruments are to be installed and consider the length of the
heated drain tubing (2 m).
3.3.1 Mount the instrument
The PHOSPHAX sc can be mounted in three different ways:
•
Wall Mount (
•
Rail Mount; refer to the instruction sheet supplied with the
Rail Mounting Hardware.
•
Stand Mount; refer to the instruction sheet supplied with the
Stand Mounting Hardware.
3.3.1.1 Wall mount
Refer to
Figure 5
,
, and following instructions to mount the
analyzer to a wall.
1. Align and install the fastening bracket to the wall.
2. Attach the angle bracket to the instrument using the
supplied screws.
3. Slide the bottom of the enclosure onto the fastening bracket.
4. Attach the enclosure to the fastening bracket.
5. Attach the angle bracket on the enclosure to the wall.