procedure:

Connect the process controller according to the following tables.

The electrical connection module of Type 8693 features a setscrew
with nut which is used to connect the Technical Earth (TE)
(see “Fig. 13: Connection with PROFIBUS DP”).

Connect setscrew (TE connection) to a suitable grounding point.
To ensure electromagnetic compatibility (EMC), ensure that the
cable is as short as possible (max. 30 cm, Ø 1.5 mm

2

).

When the operating voltage is applied, the process controller is
operating.

Now make the required basic settings and actuate automatic
adjustment of the process controller, as described in
Chapter “13. PROFIBUS DP start-up”, page 35.

The settings in the

BUS.COMM menu option are described

in Chapter “13. PROFIBUS DP start-up”.

circular plug m12, 4-pole

socket m12, 5-pole

Operating voltage

(inversely coded)
(PROFIBUS DP)

TE terminal

1

2

3

4

1

2

4

3

Pressure sensor P1, P2

circular plug m8, 4-pole

2

1

4

3

5

Fig. 13: Connection with PROFIBUS DP

Socket M12, 5-pole (bus connection)

pin

signal

1

VP+5

2

RxD/TxD-N

3

DGND

4

RxD/TxD-N

5

Shielding

Tab. 10: Socket M12, 5-pole (bus connection)