4unload the xk function modules, 1 preparation – FlexLink XK Функциональные модули Руководство пользователя User Manual

Page 31

background image

Unload the XK function modules

Create

d

by EBCCW

0

0

:06

23

5114899

4

Unload the XK function modules

4.1

Preparation

This section describes the steps that are required for unloading the mod-
ules for the XK system. It is recommended to make use of the devices de-
scribed. When using this or another device this device is expected to be
provided with a quality mark.

.

Note! The operations concerned are to be carried out calmly in
order to be able to carefully monitor any movement of the XK
module.

Before starting the unloading a good preparation is required. The appropri-
ate devices must be available. Apart from that the first transport check is
an important part of the unloading, as in case of damage this should be
mentioned on the delivery note in relation to guarantee and the like.

After arrival of the modules a transport check is to be carried out. The check
can be carried out at the moment the module has been unloaded from the
container or the truck. The technical specification gives the dimensions to
be checked. Is the module delivered undamaged and is it the correct mod-
ule?

Figure 7 Module serial number type plate with configurator string

.

Note! Any damage is to be mentioned on the delivery note and
should immediately be reported to the supplier. This with respect
to the guarantee of the module.