beautypg.com

Franklin Fueling Systems T5 Series Fuel Management System Operators Guide User Manual

Page 18

background image

14

How to Manually Start Static Tests

This procedure requires User level privileges.

Starting at the Home/Status screen, press the FMS application button.

1. 

Press the Application Menu button.

2. 

Press the Control button.

3. 

Step 1

Step 2

Step 3

Press the Tanks button.

4. 

Select the tank that will be tested. If the tank does not appear on the screen, use the Scroll Down button to view more 

5. 

options.
Press the Test Type and choose either Monthly or Yearly.

6. 

Step 4

Step 5

Step 6

Press the Checkmark button to start the test.

7. 

Step 7

Static Test Results

Pass – A passing result ensures the integrity of the tank is good.
Fail – Test failure will be indicated by a Warning light and/or annunciator. Additionally, a report may print (if the console is 

programmed to do so, see the T5 Programming Guide - p/n 000-2142).
Abort – The result has been stopped due to variations in float level and/or product temperature that are outside of the leak 

test threshold. This may be caused by:

Dispensing

• 

Loss of Probe Signal

• 

Delivery

• 

Rapid Temperature Change

• 

Theft

• 

Product Lower than the lowest RTD

• 

Pump Started

• 

Incomplete – When the test does not collect enough data before the programmed time limit ends, the test will be 

Incomplete. When it’s necessary to obtain valid results for compliance reasons, start the test manually.