Add a Cable Retraction System
Depending upon the Cable Cubby enclosure, an additional retraction system with up to
three more retractors may be installed. As in the initial retraction system installation, existing
AAPs and their brackets may need to be relocated, removed, or replaced to allow room for
the additional system. The additional system does not have to mount the same as the first,
but proper under-table clearance for both systems, as well as clearances from each other
must be considered.
UNSWITCHED
100-240V/ 5AMAX
UNSWITCHED
USP HUB4 AAP
AC
TIVITY
100-240V/ 5AMAX
Check for adequate cable
clearance inside the
Cable Cubby enclosure.
Retractors take
two AAP spaces.
Filler modules
(part #
70-678-08)
take up the same
space as one retractor.
CC 800 shown
The retraction system must be mounted on either
side of the enclosure with the cable release buttons
against the enclosure side walls.
Figure 29.
Add a Retraction System
No matter which mounting method used, adequate space must be available inside the
Cable Cubby enclosures for the addititonal cables.
As shown in a typical horizontal mounting installation in figure 30, the second retraction
system will extend the opposite direction as the first.
UNSWITCHED
100-240V/ 5AMAX
UNSWITCHED
USP HUB4 AAP
AC
TIVIT
Y
100-240V/ 5AMAX
When installing fewer
than three retractors
on a side, use filler
modules.
(part #
70-678-08)
UNSWITCHED
100-240V/ 5AMAX
UNSWITCHED
100-240V/ 5AMAX
USP HUB4 AAP
AC
TIVITY
Existing System
Additional System
CC800
Figure 30.
Two Retraction Systems (Horizontal Mount)