GE Industrial Solutions BDCBB H569-445 User Manual
Page 26

Secondary DC Power Distribution Bay H569-445
Issue 3 June 2012
26
circuit wiring from the VIM is redressed in the field this feature can be used to assign the
appropriate circuit to the new load location.
Item
Control and
Operations
Parameters
Description
18
Start Lamp Test
Cycles the illumination of the front panel LED and Backlight through Red, Amber, and
Green
19
Clear Latched Events
Clears a latched Overload Alarm event. Note the Overload Latched Event must be enabled
to have a latched alarm.
20
Start Alarm Test
Asserts Form-C alarms available at connector J3 in a fixed sequence: Fuse Alarm (FA),
Power Loss (PL), and Overload (OVL). Alarm asserted is displayed on the front panel.
Feature can be used to test the site’s remote monitoring systems and wiring.
Basic items to configure in a -48V meter retrofit or replacement
Use the previous VIM1C menu map and table as a reference to configure the basic items
listed below:
•
Configure the Number Of Loads present in the BDFB (Item 5)
•
Set the display Meter Type (Item 6)
•
Configure the Load ID Format presented on the display (Item 7)
•
Set the position of the First Load Location (Item 8)
•
Configure the Shunt Rating of each monitored load in amps (Item 9)
•
Set the state of each load as installed or not installed at Load Available (Item
12)
•
Set the local audible alarm indicator capability at Local Buzzer (Item 2)