9. 48" Head Platform Right Hand Drive
PNEG-1842 42"-48" Bucket Elevator Platform and Ladder “X” Series
83
Install Toe Boards
1. Install the longest toe board assemblies (HSP42015X and HSP48042X). Orient toe boards so the
(HSP42015X) is towards the up-leg end of the lower head.
2. Fasten toe boards to the support channels using 5/16" x 1" flange bolts (S-7440) and 5/16" flange
nuts (S-3611).
3. Install each end of the long “Z” toe board assembly to the bottom of the long toe board assemblies
using 5/16" x 1" flange bolts (S-7440) and 5/16" flange nuts (S-3611).
4. Install the “Z” toe board (HSP48037X) on the drive side at the down-leg end. Fasten to the ends
of the toe boards (HSP42015X and HSP42018X) using 5/16" x 1" flange bolts (S-7440) and
5/16" flange nuts (S-3611).
5. Install the “Z” toe board (HSP48036X) on the hatch side at the down-leg end. Fasten to the ends
of the toe boards (HSP42015X and HSP42018X) using 5/16" x 1" flange bolts (S-7440) and
5/16" flange nuts (S-3611).
Figure 9N