beautypg.com

Soil ec surveyor – Veris Technologies MSP EC and pH (1997-2008 CF card drive 1.10M) - Operating Instructions User Manual

Page 10

background image

Veris Technologies

Pub. #OM MSP03-1

10

Soil EC Surveyor

Installation and Set-up

If the unit has been crated and delivered via closed-van commercial freight, the tongue (if equipped)
may need to be installed prior to use. before doing so, please take precautions to ensure that the
framework is properly supported to ensure safety.

Remove bands that attach tongue assembly to shipping pallet. Use a forklift or small loader to
position tongue assembly to allow insertion of pins connecting tongue and toplink to MSP mainframe.

Prior to operating the implement for the first time, it is important to check all fasteners

– some may

have loosened during shipment.

Route cables and hydraulic hoses along tongue and through hose guide. Tie-strap securely.
Connect signal cable to Veris instrument EC Signal port and electrical cables to battery. Be careful to
attach black cables to negative/ground terminal. DO NOT REVERSE POLARITY.


If unit is equipped with hydraulic power pack, insert hydraulic ends into quick-couplers, being careful
to insert the end marked “P” into the pressure or oil output coupler, and the end marked “T” into the
tank or return line coupler. Note: if not using Veris-supplied hydraulic power pack, be certain that
tractor or hydraulic power source is equipped with open-center hydraulics. If tractor has closed center
hydraulics, make sure MSP is equipped with Closed Center Hydraulic Kit (part #26369) and that
poppet valve is in closed center position (in).

Install 7/8”
pins here

Install 1” pin
here

12 V Power leads
-raise-lower
-external control module

pH signal cable (if equipped)

EC signal cable