beautypg.com

Technical data, Differential pressure and t, Time versions and options (extract) – M&C TechGroup SP2500-H_C_I_BB_F Data sheet User Manual

Page 2

background image

M&C TechGroup Germany GmbH • Rehhecke 79 • 40885 Ratingen • Germany

[email protected] • www.mc-techgroup.com • Fon +49 2102 935-0 • Fax +49 2102 935-111

2.4

Technical Data

Technical specifications and illustrations are without

obligation, subject to modifications. 03.03/06.06

Gas Sample Probe Version

SP2500-H

SP2500-H/C/I/BB

SP2500-H/C/I/BB/F

Part No.

20S3510

20S3520

20S3530

Integrated backflush

no

via filter chamber

via filter element

Protective cover

yes

Terminal box

IP54 EN60529

Filter housing material

Stainless steeel 316 / 316Ti*

Sealing materials

FPM*

Probe flange sealing material

Novapress

Insitu probe tube/prefilter

Optional

Sample pressure max.

0,4-6 bar* abs.

Ambient temperature

-20 °C to +60 °C*** /PT100, /Fe-CuNi, /Ni-CrNi** = -20°C to +80°C

Filter chamber volume

280 cm

3

Filter element, porosity

S-2K150= Ceramic*, 2micron, /F-0, 1GF150= Glass fibre**, 0,1 micron, /FW= Spun glass**

Thermostat, Temperature adjustment

0-180°C* /PT100** /Fe-CuNi** /Ni-CrNi**

Ready for operation

after 40min

Low temperature alarm contact

Change-over contact Contact rating: 250V, 3A~, 0,25A= Alarm point: ∆T 30°C

Sample gas outlet connection

1x 1/4“ NPTi* tube connectors ø 6, 8 or 10 mm**

Backflush/Test gas connection

1/4“ NPTi* /C**= tube ø 8mm

backflush: tube Ø 8mm, span: tube Ø 6mm

Shut off valve connection /I

1/8” NPT i

Pressure range contol air /I

3 - 10 bar

Power supply

230V 50/60 Hz, 800W /115V** = 115V 60Hz, 800W (fuse protection 10A)

Electrical connections

Terminals max. 4mm

2

, 2x PG 13,5 cable gland

Electrical equipment standard

EN 61010, EN 60519-1

Mounting flange

DN65 PN6-B, SS316Ti* >DN or ANSI possible**

Weight

17kg*

*

Standard

**

Options

*** In case of higher ambient temperatures use option PT100 (Part No. 20S9025) or thermocouple Fe-CuNi respectively Ni-CrNi (Part No. 20S9027 resp.

20S9028) instead of the thermostate controller. Then, an additional electronic temperature controller (see data sheet 2-5.1) is necessary.

∆P and T90 at flow of:

100

200

500

1000

1500

Nl/hr

∆P with new filter element S-2K150/GF150

0,007

0,011

0,02

0,035

0,040

bar

T90-time for SP2500-H.. without tube

8

5,5

3

1

0,5

s

Differential pressure and T

90

-time

Versions and options (extract)

Executions

Data s.

Version

Part-No.

Basic execution, heated to 0-180 °C ,with weather protection shield, material SS 316Ti

2-1.1.5

SP2500-H

20 S 3510

Basic execution, heated to 0-180 °C ,with weather protection shield, material SS 316Ti

2-1.1.5

SP2500-H/C/I/BB

20 S 3520

Basic execution, heated to 0-180 °C ,with weather protection shield, material SS 316Ti

2-1.1.5

SP2500-H/C/I/BB/F

20 S 3530

Options (Extract)
Execution with power supply 115V/60Hz

/115V

20 S 9030

Execution with second outlet for sample gas 1/4" NPTi*

/2x*

20 S 9015

Execution with back purge/calibration gas valve, opening pressure 0,7 bar, pipe 8 mm o.d.*

/C*

20 S 9435

Execution with fiber glass filter element 0,1GF150, filter porosity 0,1 µm, sealing PTFE

/GF150

20 S 9020

Execution with spec. filter housing lid and unscrewed cartridge
incl. spun glass filling, sealing FPM, Novapress

/FW

20 S 9047

Execution with with PT00 sensor instead of the thermostat, without temp. controller

/PT100

20 S 9025

Execution with thermoelement FE-CuNi ( type J) instead of thermostat, without temp. controller

/Fe-CuN

20 S 9027

Execution with thermoelement Ni-CrNi (type K) instead of thermostat, without temp. controller

/Ni-CrNi

20 S 9028

Execution with second PT100 sensor

/2-PT100

20 S 9026

Execution with special adapter flange size DN..PN6 or ANSI..150 lbs

/DN

20 S 9004

Supporting adapter type SP2500H/SA500 to support long probe tubes and prefilters with extension tube,
including flange gasket, material 1.4571

/SA500

20 S 9433

Execution with gas pre-heater GVW1, material SS304

2-1.2.5

/GVW1

20 S 9058

Execution with connection of the gas pre-heater to valve ”BB” and to gas inlet

2-1.2.5

/GVW

20 S 9062

Execution with steam heating, without controller and valves

/D

20 S 9033

* only SP2500-H