beautypg.com

Pre-operation inspection – RIDGID SeeSnake LT1000 User Manual

Page 13

background image

SeeSnake® LT1000

11

To install the stabilizers:
1. Remove the rubber foot from a leg of the frame.
2. Slide the stabilizer onto the leg of the frame, with

the solid face toward the top of the frame.

3. Replace the rubber foot and seat it firmly.
4. Repeat for all four legs. On the larger Standard unit,

install stabilizers only on the legs without wheels.

LT1000 Mini

The LT1000 Mini is a sturdy portable frame supporting

an LT1000 unit. It is light-weight, easy-to-carry and can

be used with any SeeSnake reel simply by connecting

the SeeSnake System Cable. It is an economical alterna-

tive if you need to shift your LT1000 between SeeSnake

reels frequently. The LT1000 Mini is shipped with the

LT1000 unit already installed on the portable frame.

Preparing the Laptop

To operate correctly with the LT1000, the laptop to be

used must have SeeSnake HQ software installed on it.
HQ software enables you to create, manage and store

images, audio and video from the LT1000. The software

is on the CD that ships with the LT1000. To load the

software from the CD:

You must install SeeSnake HQ and its drivers before con-

necting the LT1000 to your computer.
1. Insert the CD into the computer’s CD drive.
2. The laptop should auto-detect the CD and begin

the installation process. It may ask for an admin

password before installing the HQ software.

3. When the software installation is complete, eject

the CD and store it in a safe place.

NOTE! Software update checks will occur automatically

when the laptop is connected to the Internet. If an

update is detected you will be asked if you want to

install it, and the update will occur automatically

if you indicate you want it installed. The latest ver-

sion can be checked for manually by placing the

laptop on-line and pointing an Internet browser

to http://www.hq.ridgid.com/product-hq.php.

4. Alternatively the software may be installed by brows-

ing to the updates website given above and follow-

ing the instructions found there.

5. For detailed instructions on using HQ software to

manage your video clips, still photos, reports, cus-

tomer information and formats, direct a web-con-

nected browser to http://www.hq.ridgid.com/. You

will find on-line user instructions for every aspect of

HQ’s capabilities there.

Pre-Operation Inspection

WARNING

Before each use, inspect your SeeSnake LT1000 and

correct any problems to reduce the risk of serious

injury from electrical shock or other causes and pre-

vent machine damage.

1. Confirm that the power is OFF, any external power

and cords are disconnected and the battery is re-

moved. Inspect the cords, cables and connectors for

damage or modification.

2. Clean any dirt, oil or other contamination from the

SeeSnake LT1000 to aid in inspection and to pre-

vent the unit from slipping from your grip while

transporting or using.

3. Inspect the LT1000 for any broken, worn, missing,

misaligned or binding parts, or any other condi-

tion which might prevent safe, normal operation.

Ensure the LT1000 mounting brackets are securely

tightened.

Figure 19 – Stabilizers installed

Figure 20 – LT1000 Mini