beautypg.com

Wayne-Dalton TORQUEMASTER 9800 User Manual

Page 10

background image

Tools Needed:

10

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer.

To find your Wayne-Dalton dealer; refer to your local yellow pages / business listings or go to Find a dealer area online at

www.wayne-dalton.com

If you just removed your existing door or you are installing a
new door, complete all steps in PREPaRING ThE OPENING.
To ensure secure mounting of track brackets, side
and center brackets, or steel angles to new or retro-fit
construction, it is recommended to follow the procedures
outlined in DasMa Technical Data sheets #156, #161 and
#164 at www.dasma.com.
The inside perimeter of your garage door opening should
be framed with wood jamb and header material. The jambs
and header must be securely fastened to sound framing
members. It is recommended that 2” x 6” lumber be used.
The jambs must be plumb and the header level. The jambs
should extend a minimum of 12” (305 mm) above the top of
the opening for TorqueMaster counterbalance systems. For
low headroom applications, the jambs should extend to the
ceiling height. Minimum side clearance required, from the
opening to the wall, is 3-1/2” (89 mm).

IMPORTANT: ClOsEly INsPECT jaMbs, hEaDER aND

MOuNTING suRFaCE. aNy WOOD FOuND NOT TO bE sOuND,
MusT bE REPlaCED.
For TorqueMaster counterbalance systems, a suitable
mounting surface (2” x 4”) must be firmly attached to the
wall, above the header at the center of the opening.

NOTE: Drill a 3/16” pilot hole in the mounting surface to

avoid splitting the lumber. Do not attach the mounting
surface with nails.

weather Seal (May Not Be Included):

Cut the weather seal (if necessary) to fit header and jambs.

for quick install track: align the header seal with the inside

edge of the header and temporarily secure it to the header
with equally spaced nails. Next, fit the jamb seals up tight
against the header seal and flush with the inside edge of
the jamb. Temporarily secure the jamb seals with equally
spaced nails approximately 12” to 18” apart. This will keep
the bottom section from falling out of the opening during
installation.

for fully adjustable track: align the header seal 1/8” to

1/4” inside the header and temporarily secure it to the
header with equally spaced nails. Next, fit the jamb seals
up tight against the header seal and 1/8” to 1/4” inside
the jamb. Temporarily secure the jamb seals with equally
spaced nails approximately 12” to 18” apart. This will keep
the bottom section from falling out of the opening during
installation.

NOTE: Do not permanently attach weather seal to the jamb

at this time.

hEADROOM REqUIREMENT: headroom is defined as the

space needed above the top of the door for tracks, springs,
etc. to allow the door to open properly. If the door is to be
motor operated, 2-1/2” (64 mm) of additional headroom is
required.

NOTE: 6” lhR Conversion kit is available for 12” Radius only.

Contact your local Wayne-Dalton dealer.

BACkROOM REqUIREMENT: backroom is defined as the

distance needed from the opening back into the garage to
allow the door to open fully.

Preparing the Opening

WEaThER sEal

hEaDROOM

baCkROOM

DOOR

WIDTh

DOOR

hEIGhT

lEVEl hEaDER

PluMb jaMbs

hEaDER bOaRD

2” x 6” luMbER

PREFERRED

suITablE MOuNTING suRFaCE

2” x 6” luMbER MINIMuM

P5

Recommended

tools from

page 5

hEaDER

jaMb

jaMb

DOOR hEIghT TRACk

MANUAL LIfT

MOTOR

OPERATED

6’6”, 7’0” 15” Radius 98” (2489 mm) 125” (3175 mm)

8’0”

15” Radius 110” (2794 mm) 137” (3480 mm)

BACkROOM REqUIREMENT

hEADROOM REqUIREMENT

TRACk TYPE

TorqueMaster

®

15” Radius track

12-1/2” (318 mm)

wEAThER SEAL

quICk INsTall TRaCk

Fully aDjusTablE TRaCk

jaMb

WEaThER

sEal

1/8” TO 1/4”

WEaThER

sEal

jaMb

DOOR

sTOP

DOOR

sTOP

DOOR

sECTION

DOOR

sECTION

jaMb

jaMb

1/8” TO 1/4”