Nortel Networks NN43001-318 User Manual
Page 57
Installation procedures
57
secondary reference clock. These reference clock sources are
derived from either BRI spans or DSLs (DSL 0 and/or DSL 1).
Note 2: A clock controller is required in every cabinet or MG
1000S that contains a digital trunk.
5
Install the SILCs and UILCs. See
Procedure 17 "Installing the SILCs
6
Remove the SILCS and UILCs, if previously installed. See
18 "Removing the SILC and UILC" (page 64)
7
Install the PRI hardware. See
Procedure 19 "Installing the PRI
.
Note: This step is required for packet data implementation only.
8
Connect the ISDN BRI terminals or trunks.
a. Connect the ISDN BRI terminals for line applications:
1. Connect system cables to the cross-connect terminal.
See
Procedure 20 "Connecting system cables to the
cross-connect terminal" (page 66)
.
2. Cross-connect the DSLs at the cross-connect terminal.
See
Procedure 21 "Cross-connecting the DSLs at the
cross-connect terminal" (page 70)
.
3. Connect the terminating resistor to the SILC DSL. See
Procedure 22 "Connecting the terminating resistor to the
SILC DSL" (page 74)
4. Connect the ISDN BRI terminals to the DSL. See
23 "Connecting the ISDN BRI terminals to the DSL" (page
76)
5. Initialize a Nortel Networks M5317TDX terminal. See
Procedure 24 "Initializing a Nortel Networks M5317TDX
terminal" (page 80)
b. Connect the ISDN BRI trunks for trunking applications:
1. Connect the system cables to the cross-connect terminal.
See
Procedure 25 "Connecting the system cables to the
cross-connect terminal" (page 82)
.
2. Cross-connect the DSLs at the cross-connect terminal. See
Procedure 26 "Cross-connecting DSLs at the cross-connect
terminal" (page 83)
Nortel Communication Server 1000
ISDN Basic Rate Interface Installation and Commissioning
NN43001-318
01.02
Standard
Release 5.0
20 June 2007
Copyright © 2003-2007, Nortel Networks
.