beautypg.com

Unpacking the 1002rp server – Nortel Networks NN44200-300 User Manual

Page 26

background image

26

Chapter 3 Preparing for installation

CAUTION

Alerts you to situations where data can be lost or damaged,
equipment can be damaged, actions can result in service
interruption, and productive time can be lost.

ATTENTION

Provides information that is essential to the completion of a task.

Unpacking the 1002rp server

Introduction

Follow this procedure to unpack the server and peripherals.

WARNING

The 1002rp CallPilot server weighs approximately 34 kg (75 lb)
as shipped from manufacturing. To prevent personal injury, have
someone help you to unpack and position the server.

To unpack the equipment

Step

Action

ATTENTION

As you unpack each item, check it off against the packing list, as well as against
the following checklists provided in the Installation and Configuration Task List
(NN44200-306):

"CallPilot software media and documentation checklist"

"CallPilot server hardware checklist"

1

Carefully open the cardboard carton containing the server.

2

Remove the server from the carton; set it on the floor.

3

Carefully open the cartons containing the monitor, keyboard, mouse,
modem, and ELAN hub (if supplied), and set the peripherals aside.

4

Put all manuals, CD-ROMs, operating system disks, and any disks
for peripherals in a safe place.

5

Save all packing materials and cartons in case you must return any
equipment to the carrier.

—End—

Nortel CallPilot

1002rp Server Hardware Installation

NN44200-300

01.01

Standard

5.0

23 February 2007

Copyright © 2007, Nortel Networks

Nortel Networks Confidential

.