Nortel Networks NN44200-300 User Manual
Page 24
24
Chapter 3 Preparing for installation
Step
Description
Check
2
Unpack the server, and ensure you have all the items you need (see
"Unpacking the 1002rp server" (page 26)
Complete the following checklists that are provided in the Installation and
Configuration Task List (NN44200-306):
•
"CallPilot software media and documentation checklist"
•
"CallPilot server hardware checklist"
3
Remove the front bezel and server cover, and inspect the interior (see pages
"Removing the front bezel and server cover" (page 27)
and
4
Replace the server cover.
5
Install the power supply modules in the server (see
power supply module (AC or DC)" (page 34)
6
For a DC-powered server, set up the DC power source (see
).
7
Place the 1002rp server in the chosen location (see
8
Replace the front bezel (see page
"Inspecting the server interior" (page 29)
9
Set the DIP switches on the modem (see
"Preparing the modem" (page 44)
).
Connect the 1002rp server and devices as follows:
•
Connect the monitor, keyboard, and mouse (see
).
•
Connect the modem (see
"Preparing the modem" (page 44)
).
•
Connect the 1002rp server to the ELAN hub or switch (Meridian 1 or
Communication Server 1000 only) (see
"Connecting the server to the ELAN
ATTENTION
To comply with EMC radiation requirements, a Class A hub must be
located 10 m (33 ft.) away from the 1002rp server. Shielded Ethernet
cables must be used.
10
Nortel CallPilot
1002rp Server Hardware Installation
NN44200-300
01.01
Standard
5.0
23 February 2007
Copyright © 2007, Nortel Networks
Nortel Networks Confidential
.