beautypg.com

Mounting the mgc+100 on a 19” rack, Mounting the mgc+100 on a 19” rack -8, Chapter 2 - hardware installation – Polycom DOC2238A User Manual

Page 28: 19" attachment bar

background image

Chapter 2 - Hardware Installation

2-8

10. Place the MCU in a 23” rack and while supporting it, screw the mounting

brackets to the rack securing it with bolts and self-locking nuts.

Mounting the MGC+100 on a 19” Rack

The MGC+100 can be mounted in a 19” rack using the mounting kit (P/N-
KIT2026A). It is highly recommended that the 19” rack be located in an air-
conditioned room.

Figure 2-3 shows how to mount the MGC+100 on the 19” rack.

Figure 2-3: MCU Rack Mount

When the unit is installed on a rack, the rack must be properly grounded to the
central office ground. The rack must be grounded with two-hole compression-
type connectors using copper conductors (tinned or untinned). Wire, bus bar or
braided strap connectors are acceptable.

When the MGC+100 unit is installed on a 19” rack, environment temprature
should not exceed 35°C or 95°F.

Po

w

e

r

Ou

t

In

Po

w

e

r

Ou

t

In

Po

w

e

r

Ou

t

In

P

O

L

Y

C

O

M

R

MG

C

+

Li

n

e

1

Li

ne 1

Li

n

e

2

Li

ne 2

Li

n

e

3

Li

ne 3

Li

n

e

4

Li

ne 4

Li

n

e

5

Li

n

e

6

Li

n

e

7

Li

n

e

8

19" Attachment Bar