Rack mount safety precautions, Polycom mgc+/readimanagerreadimanager precautions, Rack mount safety precautions -3 – Polycom DOC2238A User Manual
Page 23
MGC+ Hardware and Installation Manual
2-3
Rack Mount Safety Precautions
The following precautions should be followed with regards to rack mount
safety:
•
Decide on a suitable location for the equipment rack that will hold the
MGC+/ReadiManager unit. It should be situated in a clean, dust-free
area that is well ventilated. Avoid areas where heat, electrical noise and
electromagnetic fields are generated. You will also need it placed near a
grounded power outlet.
•
Ensure that the leveling jacks on the bottom of the rack are fully
extended to the floor with the full weight of the rack resting on them.
•
In a single rack installation, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure the rack is stable before extending a component from
the rack.
•
You should extend only one component at a time - extending two or more
simultaneously may cause the rack to become unstable.
•
Before you install the rails, determine the placement of each component
in the rack.
•
Install the heaviest server components on the bottom of the rack first, and
then work up.
•
Allow the power supply units to cool before touching them.
•
Always keep the rack’s front door and all the blade’s panels and
components closed when not servicing, to maintain proper cooling.
Polycom MGC+/ReadiManagerReadiManager Precautions
The following precautions should be followed with regards to installation of
the ReadiConvene:
Use a regulating uninterruptable power supply (UPS) to protect the MGC+
from power surges and voltage spikes, to keep your MCU and ReadiManager
IAM operating in case of a power failure.