Removing the operator information panel assembly, Removing, Installing – Lenovo RD210 User Manual
Page 125: Operator, Information, Panel, Assembly

3.
Reinstall
the
screws
on
the
video
connector
3 .
4.
Reinstall
the
hard
disk
drives
and
drive
bay
filler
panels
into
the
drive
bays.
5.
Install
the
cover
(see
6.
Reconnect
the
power
cords
and
any
cables
that
you
removed.
7.
Slide
the
server
into
the
rack.
8.
Turn
on
the
peripheral
devices
and
the
server.
Removing
and
installing
the
operator
information
panel
assembly
To
remove
and
install
the
operator
information
panel,
complete
the
steps
in
this
section.
Removing
the
operator
information
panel
assembly
To
remove
the
operator
information
panel,
complete
the
following
steps.
1.
Read
the
safety
information
in
and
2.
Turn
off
the
server
and
peripheral
devices
and
disconnect
all
power
cords.
3.
Remove
the
cover
(see
4.
Disconnect
the
cable
from
the
back
of
the
operator
information
panel
1
assembly.
5.
Use
an
object
to
push
down
on
the
release
tab;
hold
down
the
release
tab
2
and
push
the
blue
push
point
on
the
rear
of
the
panel
to
the
front
of
the
server.
Chapter
5.
Installing
optional
devices
and
replacing
customer
replaceable
units
109