beautypg.com

Successful file transfer, Complete the installation of transferred files, Complete the installation of transferred files -8 – Symbol Technologies VRC 6940 User Manual

Page 37

background image

4-8

VRC 6940 Product Reference Guide

Successful File Transfer

Following a successful file transfer, the files must be copied to the flash disk before you can
use them. This happens the next time the terminal is re-initialized (cold booted). See

5. Complete the Installation of Transferred Files

, next.

5. Complete the Installation of Transferred Files

To complete the installation of transferred files, you must re-initialize (cold boot) the
terminal. To do this:

1. Disconnect the null modem cable from the VRC 6940 terminal and Host PC.

2. Replace the terminal plug cover for the serial port on the VRC 6940.

3. Perform a cold boot:

a. Press and hold the ENTER, F1 and F4 keys.

b. Press and release the ON/OFF key.

c. Release the ENTER, F1 and F4 keys.

4. When the terminal restarts, it boots according to the applications you have loaded.

For more information, refer to the documentation for the applications.