beautypg.com

To prepare the rails for 2-post installations, Figure 1-5 – Sun Microsystems SERVER 1290 User Manual

Page 20

background image

8

Netra 1290 Server Installation Guide • May 2006

4. Repeat Step 1 through Step 3 for the second inner rail.

To Prepare the Rails for 2-Post Installations

For 2-post installations, you can dismantle and reassemble the slide rail assemblies
(

FIGURE 1-5

). The slide rail assemblies can be adjusted to suit a 19-inch 2-post rack

that has a post depth in the range of 3 to 6 inches (7.5 to 15.0 cm).

FIGURE 1-5

Slide Rail Assembly–Modified for 2-Post Installation

1. Remove the nuts that secure the adjustable bracket and discard the adjustable

bracket (

FIGURE 1-3

).

2. Remove the four nuts securing the front bracket.

3. Rotate the front bracket 180 degrees and secure it facing inward (

7.

).

4. Remove the four nuts that secure the rear bracket.

5. Rotate the rear bracket 180 degrees so that it faces inward (

7.

).

6. Align the rear bracket to the appropriate markings on the slide rail assembly and

secure the rear bracket.

7. Repeat

Step 1

through

Step 6

for the second slide rail assembly.

2-Post 3" Position

2-Post 4" Position

2-Post 6" Position

Sunfire Cabinet

NGR Cabinet

Storedge Cabinet

Rear bracket

Front bracket

(facing inwards)

(facing inwards)

Slide rail assembly