beautypg.com

Installing slide rails – Sun Microsystems SERVER 1290 User Manual

Page 16

background image

4

Netra 1290 Server Installation Guide • May 2006

7. Remove the internal saddle.

See

FIGURE 1-2

.

8. Lift off the server bag.

9. Make a visual check to ensure that the chassis is undamaged.

10. Move the server to the operating location using a computer lifting device.

Note –

Power cords for the Netra 1290 server are supplied in a separate country kit.

Note –

The Solaris software and the LOM firmware are preinstalled or

preconfigured on the server.

Installing Slide Rails

Caution –

The cabinet stabilizers (if applicable) must be extended whenever a Netra

1290 server is pulled out of the cabinet.

Caution –

The Netra 1290 server, with mounting cradle, weighs approximately 286

lb (130 kg). Two people using a computer equipment lift are required to move the
server safely into the cabinet.

Caution –

Pull only one Netra 1290 server out of the cabinet at a time to prevent

unbalancing the cabinet.

Servers that are to be mounted in a cabinet use a slide rail mounting kit. This kit
includes the following:

Two lock spacers

Two lock nuts

Four slide rails, two inner and two outer

8 mm wrench

Note –

If you received your server preinstalled in a cabinet you may proceed

directly to

“Installing the Cable Management Arm” on page 24

.